Track ballast production line Manufacturer

Process of the railway track ballast production line

Big size stones are transferred to primary crusher through vibrating feeder from hopper for first crushing, then the crushed materials are transferred to impact crusher through belt conveyor for secondary crushing. The materials crushed will be transferred to the vibrating screen, and separated to different sizes. The aggregate with suitable size will be transferred to the final product pile and aggregate with unsuitable size will be transferred to the impact crusher for re-crushing. This forms a closed and manifold cycles. The sizes of final products will be graded and separated according to customers' requirements, and the duster will be attached for the sake of environment protection.
The track ballast production line are reasonable combined with different crushers and have compacted special crossing distribution in their material processing flow design, so that they are small foot printed of fields, high quality in crushed products, low in quarry dust and they will give you high reward for your investment. Their advanced electric control panel can assure the whole process discharge smoothly, running reliable, operation easily and high efficiency in power consumption.

Construction waste recycling is the separation and recycling of recoverable waste supplies produced throughout construction and remodeling. On a every day basis, millions of tons of construction and demolition waste are recycled around the globe. This procedure is done using many types of crushers, shredders and breakers. These recycling options, a lot of which are heavy-duty impact crushers, break down the waste materials into smaller more manageable and useable particles.
If you need to know the more about of the construction waste recycling equipment, Live Enquiry now!
Construction waste recycling:
Most construction crusher waste goes into landfills, growing the burden on landfill loading and operation.
Some materials could be recycled directly in to the exact same item for re-use. Others can be reconstituted into other usable products. Sadly, recycling that demands reprocessing is not usually economically feasible unless a facility utilizing recycled resources is situated close to the materials source.
Probably the most important step for recycling of construction waste is on-site separation.
These heavy-duty track-mounted recycling crushers produce cubic shaped materials in numerous item measurements. They have been made to procedure a wide range of materials. With flexible and flexible throughput capacities, they've made recycling construction debris and natural rock simpler and more efficient than ever before. This unique and evolutionary recycling answer even has the functionality to get rid of any metal contamination from the crushed materials by means of magnetic separators.